The organization has documented procedures for handing design and development outputs over to manufacturing. These procedures make sure the outputs are checked as fit for manufacture before they become the final production specifications, and that the production capability can achieve the product requirements. The results of the transfer and the conclusions drawn from it are recorded.
This control maps to 6 controls across 4 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 6 it maps to, and the evidence behind each claim, over MCP and REST.