The project scope sets out the product, its characteristics and the way those characteristics will be assessed or measured. The scope processes are intended to turn what the customer and other interested parties need and expect into project requirements and to organize the activities that deliver them, to keep people working inside the scope while the product is realized, and to make sure that the activities satisfy the requirements the scope sets out. The processes are developing the concept (7.3.2), developing and controlling scope (7.3.3), defining activities (7.3.4) and controlling activities (7.3.5).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.