The plan should state what records will be established and how they are maintained (design review, inspection and test, process measurement, work orders, drawings, minutes), considering how, where and for how long they are kept; contractual, statutory and regulatory requirements and how they are satisfied; the media; how requirements for legibility, storage, retrieval, disposition and confidentiality are set and satisfied; how records are made available when required; what records are supplied to the customer, when and how; the language of textual records where applicable; and disposal.
This control maps to 8 controls across 6 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 8 it maps to, and the evidence behind each claim, over MCP and REST.