Floor level changes at or inside installed ICT are ramped at 1:48 or less, except vertical changes of 6.4 mm or less and bevelled changes of 13 mm or less at no more than 1:2. Operating areas inside an enclosure give at least 760 mm by 1 220 mm of clear floor with one side fully open, and alcoves are at least 915 mm wide for forward approach deeper than 610 mm, or 1 525 mm wide for parallel approach deeper than 380 mm.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.