A documented overall safety validation plan states when validation happens and who performs it; the relevant EUC operating modes (set-up and adjustment, start-up, teach mode, manual, semi-automatic and automatic running, steady state, reset, shutdown, maintenance and foreseeable abnormal conditions) and which safety systems must be validated in each before commissioning; the technical strategy (analysis, statistical testing and similar); the measures and procedures confirming that allocation was done correctly and that each safety function meets both the functions and the integrity requirements; explicit reference to each element in the outputs of 7.5 and 7.6; the validation environment including calibrated equipment; pass and fail criteria; and how results, particularly failures, are evaluated.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.