The planned arrangements for confirming that requirements for products and services are satisfied take in the control plan and are documented in the way the control plan sets out. The arrangements for first release take in approval of the product or service. After any change that follows first release, approval is carried out again as ISO 9001 clause 8.5.6 requires.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.