Planning of product realization covers the customer's product requirements and its technical specifications, manufacturing feasibility, logistics requirements, project planning (as in ISO 9001 clause 8.3.2) and acceptance criteria. The resources named in ISO 9001 clause 8.1 c) mean the product-specific activities of verification, validation, inspection, monitoring, measurement and test, together with the product's acceptance criteria.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.