FAA AC 20-152A - Development Assurance for Airborne Electronic Hardware
Section 5.11: COTS IP in custom devices (IP objectives) – FAA AC 20-152A - Development Assurance for Airborne Electronic Hardware

FAA AC 20-152A - Development Assurance for Airborne Electronic Hardware IP-5: IP-5 Planning the COTS IP development assurance approach

The PHAC or related plan describes the approach for each COTS IP: the IP and version with its source formats and where in the design flow it is integrated; a summary of its functions; the assurance process meeting the COTS IP objectives; the integration and usage process within device development; and tool assessment and qualification where tools are used for IP design or verification steps.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 10.1.1 10.1.1 Plan for Hardware Aspects of Certification (PHAC)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 5.11: COTS IP in custom devices (IP objectives) – FAA AC 20-152A - Development Assurance for Airborne Electronic Hardware

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.