Where the side approach is clear, or blocked by an integral element shallower than 255 mm, one or more operable parts of every type must be between 380 mm and 1 220 mm above the access floor. Where an integral obstruction exists it must be under 865 mm high; with a depth up to 255 mm the high reach is at most 1 220 mm, and with a depth over 255 mm up to 610 mm at most 1 170 mm.
This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.