The item should be built from the design data, using production-intended resources where practical (procurement, kitting, build, inspection, test); derived requirements arising in implementation are fed back to detailed design or other processes; and omissions and errors are passed on for resolution.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.