DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware 5.4.2: 5.4.2 Implementation activities

The item should be built from the design data, using production-intended resources where practical (procurement, kitting, build, inspection, test); derived requirements arising in implementation are fed back to detailed design or other processes; and omissions and errors are passed on for resolution.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A-2.7 Executable object code and any parameter data item files built and loaded on the target

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Section 5: Hardware design processes – DO-254 / ED-80 - Design Assurance Guidance for Airborne Electronic Hardware

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.