Test results are checked for correctness and each discrepancy between expected and actual results is explained. Table A-7 objective 2, described in 6.4.5.c; applies at levels A, B, C, independence required at level A; activities 6.4.5; outputs Software Verification Results.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.