Analysis confirms that the requirements-based tests covered every control coupling and data coupling that the architecture defines between components. Table A-7 objective 8, described in 6.4.4.d; applies at levels A, B, C, independence required at levels A, B; activities 6.4.4.2.c, 6.4.4.2.d, 6.4.4.3; outputs Software Verification Results. This is an analysis of test completeness, not a check of the coupling itself, which is verified with the design (Table A-4) and code (Table A-5); each coupling relationship is exercised at least once, usually in integration tests.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.