Critical Infrastructure Risk Management Program (CIRMP) Rules 2023
Part 2 baseline requirements: material risks and the four hazard families (all CIRMP Rule assets) – Critical Infrastructure Risk Management Program (CIRMP) Rules 2023

Critical Infrastructure Risk Management Program (CIRMP) Rules 2023 7(2): s 7(2) CIRMP content the board must have regard to: context outcome, interdependencies, responsible positions, methodology, review circumstances

For the annual report under s 30AKA(1), (3) and (5) of the Act, a responsible entity must have regard to whether its CIRMP describes the outcome of the operational-context process, describes interdependencies between its asset and other CI assets, identifies each position responsible for developing and implementing the CIRMP and for reviewing it and keeping it up to date, contains those positions' contact details, contains a risk management methodology, and describes the circumstances in which the entity will review the CIRMP.

Maintained by Gerard BlokdykControl text last updated

Other controls in Part 2 baseline requirements: material risks and the four hazard families (all CIRMP Rule assets) – Critical Infrastructure Risk Management Program (CIRMP) Rules 2023

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.