A responsible entity must establish and maintain a process or system in its CIRMP to identify the operational context of the asset, to identify the material risks to it, as far as reasonably practicable to minimise or eliminate those risks (including those in ss 6 and 6A) and to mitigate the relevant impact of each hazard on the asset, to review the CIRMP so that it complies with s 30AE of the Act, and to keep it current so that it complies with s 30AF.