When the entity draws up projects and technical specifications it must include adequate and complete network and information security requirements derived from risk analysis, so that the needed level of protection for information, networks and systems is designed in at the development and implementation stage rather than added later. New information and communication systems are introduced in a planned way and only after successful, documented testing shows that information is protected against loss of availability, integrity and confidentiality.