Staff must know that they are expected to tell a designated manager about any risk, or any sign that product, equipment, packaging or raw materials are unsafe or outside specification, so that issues needing immediate action can be resolved.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.