Besides showing which rooms are to be certified, the floor plans lodged with the application must clearly mark any lift, toilet, bathroom, kitchen, lunch room or carpeted office. The note says the Regulator would not usually include such spaces in a certified facility.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.