Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2)
Part A: Requirements for certification – Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2)

Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2) A2: Keeping out surface run-off water

What does A2 require?

The facility has to be designed so that surface run-off water cannot get in.

Maintained by Gerard Blokdyk

Other controls in Part A: Requirements for certification – Australia OGTR Guidelines for Certification of a PC2 Plant Facility (Version 3.2)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.