Decontamination must happen either in the room or at another location, provided any GMOs, waste, equipment or personal protective equipment are carried to the decontamination site as the GMO transport, storage and disposal guidelines the Regulator issues (in their current form) and the Regulator's other relevant guidelines require. (At this point the source gives that title with the word Transport apparently missing.)
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.