The PCBU ensures decontamination facilities are available for the asbestos-related work area, plant and workers; that nothing likely to be contaminated leaves the area unless decontaminated or sealed in a decontaminated, GHS-labelled container; that asbestos waste is contained and labelled before removal and disposed of as soon as practicable at an authorised site; and that contaminated PPE is sealed, decontaminated and labelled, disposed of at an authorised site so far as reasonably practicable, or laundered at an equipped laundry or kept sealed for reuse.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.