A PCBU manages under Part 3.1 the risks of excavation work, including persons falling into an excavation, being trapped by collapse, being struck by falling things and exposure to airborne contaminants, having regard to the nature of the excavation, the work and possible methods, and the means of entry and exit.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.