For high risk construction work on a construction project, the PCBU gives the principal contractor a copy of the SWMS before the work starts; reviews and revises the SWMS whenever relevant control measures are revised under r 38; and keeps a copy until the work is completed, or at least 2 years after a notifiable incident connected with it, readily accessible to the workers doing the work and available for inspection.