The PCBU puts arrangements in place to ensure high risk construction work is carried out in accordance with the SWMS and, if it is not, ensures the work stops immediately or as soon as safe and resumes only in accordance with the statement.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.