AS9100D - Aerospace Quality Management System
Clause 8: Operation – AS9100D - Aerospace Quality Management System

AS9100D - Aerospace Quality Management System 8.5.1.1: Control of equipment, tools and software programs

What does 8.5.1.1 require?

Any equipment, tooling or software that automates, controls, monitors or measures production is validated before it is released for production use and is then kept in good order. For production equipment and tooling held in storage, requirements are set out, including regular checks on preservation or condition.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • GRH 3.5 GRH 3.5 Ground Support Equipment (GSE)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 8: Operation – AS9100D - Aerospace Quality Management System

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.