Above ground, a water service must be kept at least 25 mm from electrical and telecommunications conduits, wires and cables, consumer gas pipes, sanitary and stormwater drainage, other water services and any other service, measured from the outside of any insulation or wrapping.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.