Buried pipes are surrounded by compacted sand or fine-grained soil (75 mm in the 2003 text) with nothing hard touching the pipe; excavated material may be used for final backfill only if free of rock, hard and organic matter and large lumps.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.