Precondition (mandatory for certification). The project must earn a point or more in any one of these active design features: Circulation Network (V03), Facilities for Active Occupants (V04), Site Planning and Selection (V05) or Physical Activity Spaces and Equipment (V08). Parts: Design Active Buildings and Communities.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.