UNECE WP.29 R156
Paragraph 7.2: Requirements for the vehicle type – UNECE WP.29 R156

UNECE WP.29 R156 7.2.2.4: Inform the user after execution of success or failure and of changes

What does 7.2.2.4 require?

After execution the manufacturer demonstrates that the user is able to be informed of (a) the success or failure of the update and (b) the changes implemented and any related updates to the user manual (ISO 24089 7.3.3.1).

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Paragraph 7.2: Requirements for the vehicle type – UNECE WP.29 R156

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.