UNECE WP.29 R155
Paragraphs 8 to 12: Modification, conformity of production and discontinuation – UNECE WP.29 R155

UNECE WP.29 R155 9.1.1: Conformity of production: record test results and keep the documents

What does 9.1.1 require?

Conformity of production follows Schedule 1 of the 1958 Agreement (E/ECE/TRANS/505/Rev.3) (9.1). The approval holder ensures that results of conformity of production tests are recorded and that the annexed documents remain available for a period agreed with the authority, not exceeding 10 years after production is definitively discontinued (9.1.1). The approving authority may verify the conformity control methods in each production facility at any time, normally once every three years (9.1.2).

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Paragraphs 8 to 12: Modification, conformity of production and discontinuation – UNECE WP.29 R155

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.