Technical preparation speeds resolution: an incident journal, time synchronisation (NTP) across devices, network segregation to aid containment, a protected central logging point with systems instrumented to report locally and centrally, and an accurate asset inventory with patch level, purpose, configuration, backup status and criticality. Ownership of generic, shared, service and system accounts is established, and likely key decisions and system changes are worked through in advance.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.