UK ICO Guidance on Video Surveillance including CCTV (2022)
Complying with the data protection principles – UK ICO Guidance on Video Surveillance including CCTV (2022)

UK ICO Guidance on Video Surveillance including CCTV (2022) P.13: P.13 Review the system's effectiveness periodically and stop processing if it does not achieve its purpose

Procedures should be documented and reviewed regularly to keep the standards set at installation, and the organisation should review periodically (monthly or longer as appropriate) whether the system still does what it was installed for; if it does not, it should stop the processing until the system is modified.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • Art.24 Article 24 Responsibility of the controller

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Complying with the data protection principles – UK ICO Guidance on Video Surveillance including CCTV (2022)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.