UK FCA/PRA Operational Resilience Framework
FCA SYSC 15A operational resilience (in force) – UK FCA/PRA Operational Resilience Framework

UK FCA/PRA Operational Resilience Framework F-2.9: Be able to remain within impact tolerance in severe but plausible disruption (by 31 March 2025)

A firm must ensure it can remain within its impact tolerance for each important business service in a severe but plausible disruption; under the transitional provision this had to be achieved as soon as reasonably practicable and no later than 31 March 2025, and the FCA expects to be told of any failure to meet a tolerance.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in FCA SYSC 15A operational resilience (in force) – UK FCA/PRA Operational Resilience Framework

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.