UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Duty Holder Roles and Appointments

UK Construction (Design and Management) Regulations 2015 (CDM 2015) CDM-R9: Designer Duties (Regulation 9)

Designers must eliminate foreseeable risks where possible, reduce or control risks that remain, and provide information about residual risks to those who need it.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Duty Holder Roles and Appointments

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.