UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Duty Holder Roles and Appointments

UK Construction (Design and Management) Regulations 2015 (CDM 2015) CDM-R6: F10 Notification to HSE

Projects lasting longer than 30 working days with more than 20 workers simultaneously, or exceeding 500 person-days, must be notified to the HSE using the F10 form.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Duty Holder Roles and Appointments

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.