When preparing or modifying a design, the designer applies the general principles of prevention and the pre-construction information to eliminate, so far as reasonably practicable, foreseeable risks to those building, maintaining, cleaning or using the structure as a workplace; where risks cannot be eliminated, it reduces or controls them through the design, informs the principal designer and ensures appropriate information goes into the health and safety file.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.