UK Construction (Design and Management) Regulations 2015 (CDM 2015)
Part 3 Designer duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

UK Construction (Design and Management) Regulations 2015 (CDM 2015) 10: Designs prepared outside Great Britain

Where a design is prepared or modified outside Great Britain for work covered by the Regulations, the person commissioning it (if established in Great Britain), or otherwise the client, ensures regulation 9 is complied with; this does not apply to domestic clients.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

Other controls in Part 3 Designer duties – UK Construction (Design and Management) Regulations 2015 (CDM 2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.