Requirement 0205 (Part Six: Physical, section 25.4 Physical Security Measures and Controls; applies to All entities; dated 31 October 2024; retained from Release 2025): Access by authorised personnel, vehicles and equipment to Security Zones One to Five is controlled in accordance with the physical security measures and controls for access control for authorised personnel. Zone Three and above need a sectionalised access control system, identity verified to NIPG Level 3 at card issue, single-factor (Zone Five dual-factor) authentication, identity cards and full, regularly reviewed audit logs.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.