Requirement 0204 (Part Six: Physical, section 25.3 Physical Security Measures and Controls; applies to All entities; dated 31 October 2024; retained from Release 2025): Perimeter doors and hardware in areas that process, store or communicate security classified information or resources are constructed and secured in accordance with the physical security measures and controls for perimeter doors and hardware. SCEC-approved Security Level 3 locks, hardware and keying in Zones Three to Five; doors to Technical Note 1/15 (Zones Two to Four) and 5/12 (Zone Five).
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.