Oregon adopts the federal fire protection and prevention subpart, so the employer develops a fire protection programme for all phases of construction with firefighting equipment conspicuously located, inspected and maintained and fire extinguishers distributed as the rule prescribes (1926.150), controls ignition sources, storage and open yards and keeps exits and fire lanes clear (1926.151), handles and stores flammable liquids in approved containers, cabinets and rooms with dispensing, tank and service station requirements (1926.152), stores and uses liquefied petroleum gas to the rule's container, location and ventilation requirements (1926.153) and uses temporary heating devices with clearances, ventilation and stability (1926.154).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.