During erection, alteration or repair, structures and every part of them get whatever bracing or guying stops them overturning or collapsing, and that temporary shoring, bracing or guying stays in place until the structure or part has been secured some other way against overturning and collapse.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.