In buildings or structures of wood floor construction, the employer lays under-flooring tier by tier as the joists go in, or where double floors are not used, completely floors the joist tier immediately below the level where work is performed, leaving open only the spaces required for ladders and shaftways.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.