The instruments or structures chosen should be put in place and cover bought. That means drafting indemnity, assignment, warranty and other contract terms that shift or assign risk to the other side, purchasing insurance or setting up self-insurance, setting deductibles and retention levels, setting limits and payouts, naming who is answerable for meeting the conditions of each approach, and creating the structures through which risk passes. The prioritized risk matrix, with the risk optimization plan, should then be updated to show the financing, insurance and structural controls now operating, the revised residual risk analysis and how performance compares with the residual risk planned.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.