OCEG GRC Capability Model (Red Book 2.1)
Proact (P) – OCEG GRC Capability Model (Red Book 2.1)

OCEG GRC Capability Model (Red Book 2.1) P2.2: Implement and manage the code

What does P2.2 require?

Distribution should be planned and launched, with help desk staff and other answerers trained before release, the code delivered to every targeted stakeholder, and receipt confirmed. Reinforcement should continue through communication and training, the code should be publicly disclosed and filed where mandates demand it, evidence of awareness and understanding should be producible, and suppliers and partners should accept the code or an equivalent as a condition of doing business. The code should be reviewed on a cycle with defined re-evaluation triggers such as legal, operating or policy change, named people watching for those triggers, and adherence built into individual performance criteria.

Maintained by Gerard Blokdyk

Other controls in Proact (P) – OCEG GRC Capability Model (Red Book 2.1)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.