The framework should require monitoring by front line units of compliance with their limits, reported to IRM at least quarterly (monitoring and reporting in G.3 to G.5 more often as the size and volatility of risks or material changes require).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.