NIST SP 800-53 Revision 5.1 HIGH
CP Contingency Planning

NIST SP 800-53 Revision 5.1 HIGH CP-2(2): Capacity Planning

Conduct capacity planning so necessary capacity exists during contingency operations; HIGH baseline.

Other controls in CP Contingency Planning

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.