NIST SP 800-53 Revision 5.1 HIGH
CP Contingency Planning

NIST SP 800-53 Revision 5.1 HIGH CP-10(4): Restore Within Time Period

Provide capability to restore system components within FedRAMP-defined time period from configuration-controlled and integrity-protected information; HIGH only.

Other controls in CP Contingency Planning

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.