NIST SP 800-53 Rev 5 HIGH
CP: Contingency Planning – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH CP-7: CP-7 Alternate Processing Site

a. Establish an alternate processing site, including necessary agreements to permit the transfer and resumption of [Assignment: organization-defined system operations] for essential mission and business functions within [Assignment: organization-defined time period consistent with recovery time and recovery point objectives] when the primary processing capabilities are unavailable; b. Make available at the alternate processing site, the equipment and supplies required to transfer and resume operations or put contracts in place to support delivery to the site within the organization-defined time period for transfer and resumption; and c. Provide controls at the alternate processing site that are equivalent to those at the primary site.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • CP-7 Alternate Processing Site

FedRAMP Moderate · 1 control

  • CP-7 Alternate Processing Site

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CP: Contingency Planning – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.