NIST SP 800-53 Rev 5 HIGH
CP: Contingency Planning – NIST SP 800-53 Revision 5.1 HIGH

NIST SP 800-53 Rev 5 HIGH CP-10: CP-10 System Recovery and Reconstitution

Provide for the recovery and reconstitution of the system to a known state within [Assignment: organization-defined time period consistent with recovery time and recovery point objectives] after a disruption, compromise, or failure.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 3 controls across 3 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

FedRAMP High · 1 control

  • CP-10 System Recovery and Reconstitution

FedRAMP Moderate · 1 control

  • CP-10 System Recovery and Reconstitution

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in CP: Contingency Planning – NIST SP 800-53 Revision 5.1 HIGH

Query this from an agent

The graph holds this control, the 3 it maps to, and the evidence behind each claim, over MCP and REST.