NIST SP 800-161 Rev 1
C-SCRM Family: Planning

NIST SP 800-161 Rev 1 161R1-PL-8: Security and Privacy Architectures

Builds supply chain considerations into architecture, including diversity, provenance and the ability to replace a supplier.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 14 controls across 12 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

CIS Controls v8 · 2 controls

  • CIS-12.2 Establish and Maintain a Secure Network Architecture
  • CIS-16.10 Apply Secure Design Principles in Application Architectures
  • SEC01-BP07 Identify threats and prioritize mitigations using a threat model

C5 (Germany) · 1 control

  • C5-SSO-05 Exit strategy for the receipt of benefits

FedRAMP High · 1 control

  • PL-8 Security and Privacy Architectures

FedRAMP Moderate · 1 control

  • PL-8 Security and Privacy Architectures

ISO 27001:2022 · 1 control

  • 8.27 Secure system architecture and engineering principles

ISO 27002:2022 · 1 control

  • 8.27 Secure system architecture and engineering principles
  • 03.16.01 Security Engineering Principles

NIST SP 800-172 · 1 control

  • 3.11.1e Threat-Aware Risk Assessment

NIST SP 800-218 · 1 control

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in C-SCRM Family: Planning

You are reading one control. How much of NIST SP 800-161 Rev 1 have you already done?

NIST SP 800-161 Rev 1 161R1-PL-8 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-161 Rev 1 your existing evidence covers. Hold C5 (Germany) and 94 of 191 NIST SP 800-161 Rev 1 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the C5 (Germany) pair alone.

Query this from an agent

The graph holds this control, the 14 it maps to, and the evidence behind each claim, over MCP and REST.