New Zealand Information Security Manual (NZISM)
Chapter 6: Information security monitoring – New Zealand Information Security Manual (NZISM)

New Zealand Information Security Manual (NZISM) 6.3.6.C.02: 6.3.6.C.02 Change management steps for routine and urgent changes

Agencies should make sure that, for both urgent and routine changes: the process for managing change, as the relevant information security documentation defines it, is followed; the relevant authority approves the proposed change; any proposed change that could affect a system's security or accreditation status is put to the Accreditation Authority to approve; and every related information security document is brought up to date to reflect the change.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • ISM-0912 Change and configuration management plan

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 6: Information security monitoring – New Zealand Information Security Manual (NZISM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.